Temporary Structure Completion Certificate Please enable JavaScript in your browser to complete this form. - Step 1 of 3Project Name:Venue Name:AddressAddress Line 1Address Line 2CityState / Province / RegionPostal CodeDate / TimeDateTimeNextBuild ComplianceDescription of Installation:Installation: YesNoN/A General Condition of installation is good?YesGeneral Condition of installation is good? YesNoGeneral Condition of installation is good? NoN/AGeneral Condition of installation is good? N/ACorrect Location of joining pinsYesCorrect Location of joining pins YesNoCorrect Location of joining pins NoN/ACorrect Location of joining pins N/AAll joining bolts present & tightenedYesAll joining bolts present & tightened YesNoAll joining bolts present & tightened NoN/AAll joining bolts present & tightened N/ABallast installed at correct quantity and locationsYesBallast installed at correct quantity and locations YesNoBallast installed at correct quantity and locations NoN/ABallast installed at correct quantity and locations N/AInstalled to method statement and relevant standardsYesInstalled to method statement and relevant standards YesNoInstalled to method statement and relevant standards NoN/AInstalled to method statement and relevant standards N/ADoes the system require any additional work or remedial action?YesDoes the system require any additional work or remedial action? YesNoDoes the system require any additional work or remedial action? NoN/ADoes the system require any additional work or remedial action? N/A Reasons For Any Non-ComplianceAny Further Actions NecessaryInspections for Demountable Structures This Structure(s) has been inspected as part of this handover procedure covering a period of up to 7 days thereafter. After this 7 day period has elapsed, it is the responsiblity of the client/end user to ensure ongoing, dated and recorded structural inspections carried out by a suitably qualified / competent person(s) take place as a minimum of every 7 days thereafter, or at higher frequency in circumstances of severe weather, overloading, impact damage, sabotage or illegal adaptions. NextSign Off“I hereby certify that the above installation has been satisfactorily completed to comply with the requirements of the: Institution of Structural Engineers Temporary Demountable Structures (fourth edition) HSG195 The Event Safety Guide. I hereby certify that the above installation has been installed in accordance with the designer/manufacturer’s guidance set instructions. The installation has been visually inspected throughout and conforms with relevant legislation and general good practice. The installation has been visually inspected throughout and the above checks have been conducted. I hereby certify that the above installation has been installed in accordance with the structural design that has been submitted.Signature Clear Signature Name *FirstLastCompanySubmit